ICON Project Phase 1 Stevenage

The ICON Project Phase 1 consists of four residential blocks (Block 4, Block 5, Block 6, and Block 7) with varying storey counts, as outlined below:

  • Block 4: 13 storeys
  • Block 5: 9 storeys
  • Block 6: 16 storeys
  • Block 7: 9 storeys

The total concrete usage for the entire phase is 10,500 m³, and the total steel usage is 1,300 tons. The project duration is planned for 50 weeks.