by @dm1n1Str4t0r | Jan 14, 2022 | Case Studies
Meadows We are on site to redevelop the existing community centre, providing an improved community hub alongside a residential development of 78 dwellings. The community hub is a reinforced concrete frame over 2 stories and the residential block is constructed over 6...
by @dm1n1Str4t0r | Jan 14, 2022 | Case Studies
Kenilworth Road Located in Stevenage we are constructing two main podium slabs over 4000m2 with transfer beams up to 1500mm deep alongside Hill Partnerships. The period on site is September 21 until March 2022. ROL Construction Ltd, Unit 15 Smallford Works, Smallford...
by @dm1n1Str4t0r | Jan 14, 2022 | Case Studies
Littlemore Located at Littlemore Park, Oxford we are almost complete in the construction of 3 reinforced concrete frames spanning from 2 to 5 floors to provide up to 270 residential affordable homes, works commenced in April 2021 and will complete in Spring 2022. ROL...
by @dm1n1Str4t0r | Mar 1, 2019 | Case Studies
Agar Place, Camden We are on site on the latest phase of the regeneration project at Agar Grove Camden. Following demolition of previous blocks, we are constructing 2 large reinforced concrete frames over 6 floors to passivehaus standards. Works to the frames will...
Recent Comments